OXY Oil Field
We delivered air-handling equipment to ensure the operating environment for the water pumping and transport technology areas. Our delivery included AeroMaster Cirrus air-handling units in the C3 class corrosion resistance version according to the EN ISO 14713 standard with a total air output of 44,000 m3/h. We also delivered condensing units with a total cooling capacity of 328 kW. It is interesting to note that these condensing units guarantee operation at outdoor temperatures up to 55 °C. This project also includes the battery room. We ensured ventilation of this room using Vento fans in the ATEX version. We delivered the complete air-handling project documentation for this project. We also performed installation of an M&C system for the above-mentioned devices as well as their commissioning in Oman.